Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution - Khalid S. Al-gahtani - Livres - LAP LAMBERT Academic Publishing - 9783843350709 - 13 décembre 2010
Si la couverture et le titre ne correspondent pas, le titre est correct.

Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution

Prix
€ 79,99

Commandé depuis un entrepôt distant

Livraison prévue 24 août - 7 sept.
Recevez une notification pour les nouvelles sorties de Khalid S. Al-gahtani
Ajouter à votre liste de souhaits iMusic

Pas encore évalué

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

Médias Livres     Paperback Book   (Livre avec couverture souple et dos collé)
Validé 13 décembre 2010
ISBN13 9783843350709
Éditeurs LAP LAMBERT Academic Publishing
Pages 324
Dimensions 226 × 18 × 150 mm   ·   476 g
Langue et grammaire Anglais